Industrial


Nampak Segensworth

Relocation of a medical packaging factory and associated offices from a dated industrial park to a brand new facility. The relocated process equipment included a number of large folding and press machines as well as an extensive dust extract system. The services installations included evaporative cooling, centralised compressed air and low energy high bay lighting.


Vibrometer, Basingstoke

Relocation of an electronics factory and associated offices to larger premises. Vibrometer produce transducers and components for the aviation industry which required the use of bench top magnification equipment as well as multiple machines, test booths and fume cupboards. All of these (over 1000 items of machinery) were moved as part of the works. The services installations included centralised compressed air, vacuum and industrial gases, as well as close control air conditioning and electrical services.


Chitty Foods Abattoir, Guildford

New build construction of a cattle abattoir and beef joint cutting room, plus associated cold store rooms and offices. The project was commissioned following a fire in the existing premises and involved maintaining the existing processes while the new construction occurred. The services installations included process cooling and ventilation, as well as electrical distribution and lighting. All services needed to be corrosion-resistant, many of which required the use of stainless steel conduits and pipework.


Venture Quays, East Cowes

Provision of new services and offices within a very large wind turbine blade manufacturing facility located on the Isle of Wight. Aged installations were removed and replaced with modern low energy M&E services, extending the life of this iconic building which dominates the skyline of East Cowes